Upgrading Kyvos and Kyvos Manager for Azure Marketplace Deployments
Applies to: Kyvos Enterprise Kyvos Cloud (SaaS on AWS) Kyvos AWS Marketplace
Kyvos Azure Marketplace  Kyvos GCP Marketplace Kyvos Single Node Installation (Kyvos SNI)
This section provides information on how to upgrade Kyvos and Kyvos Manager and roll back patches.
Upgrading Kyvos and Kyvos Manager
You can easily upgrade both Kyvos and Kyvos Manager applications to a newer version by simply selecting the required version from the Kyvos Manager portal.
To upgrade Kyvos and Kyvos Manager, perform the following steps.Â
On the navigation bar, click Application Update > Upgrade.Â
The Upgrade page is displayed with the current version details of Kyvos and Kyvos Manager.Â
Select the required Version  from the Upgrade To list to which you want to upgrade. Â
NOTE: In the Upgrade To list, all future versions available for upgrading will be displayed.To view upgrade options, click the  Show Upgrade Options link, and configure the following options as needed.
Parameter/Field | Description |
---|---|
Overwrite | Select this option to override the existing templates in your Kyvos environment.
|
Backup |
|
Click the Upgrade Now button on the top-right of the page.
Â
Note
If the upgrade operation fails, you can resume it by clicking the Click to resume option. The upgrade will resume from the point where it last failed. Additionally, you can view the details of the failed operation by clicking the Click to view details option.
On the displayed confirmation message box, select the Start Kyvos Service checkbox to start the service automatically after the upgrade.
Enter your Kyvos Manager Password to confirm upgrade deployment.
Note
You need to manually restore the files uploaded from the Configuration Files page (if any), after upgrading Kyvos.
Before the upgrade, a backup will be created and saved at /data/kyvos/app/ location automatically.
Before applying the Kyvos upgrade, ensure that the Service account attached to the Kyvos Manager node has the permission required for updating Functions.
To see upgrade history, click the Actions menu (...) and select the View History option.
RollbackÂ
You can easily roll back both Kyvos and Kyvos Manager applications by simply selecting the required version from the Kyvos Manager portal.
To roll back the cluster deployment to a previous version, perform the following steps.
Create a manual backup of your existing cluster using the steps explained in the Upgrading Kyvos Manager and Kyvos  section.
On the navigation pane, click Application Update > Rollback.
The Rollback page is displayed.ÂClick the Select rollback state link. From the displayed dialog box, choose the state to which you want to roll back. You can use the search box to Search for a specific version. The rollback state is selected. You can also change the rollback state using the Change rollback state link.Â
Select the required rollback version.Â
The Backup Path path shows the path used for creating/restoring a backup of Kyvos states in case of Deploy Upgrade and Deploy Patch/Rollback operations. The backup path should be consistent across all the available systems. You can edit this path using the Modify Backup Path option from the three-dots menu. A ny backup created prior to changing the path remains unaffected and will continue to be available at the same location.
Click the Rollback Now button from the top-right of the page.
Â
On the displayed confirmation message box, select the Start Kyvos Service checkbox to start the service automatically after rollback.
Enter your Kyvos Manager Password to confirm the rollback. Kyvos takes you to the  Operations page  followed by the  Rollback Logs  details page.
Note
If the Kyvos Manager rollback operation fails, followed by Kyvos rollback, you can resume it by clicking the Click to resume option. The Kyvos Manager rollback operation will resume from the point where it last failed. Additionally, you can view the details of the failed operation by clicking the Click to view details  option.
Deploy a PatchÂ
To deploy a patch on an existing Kyvos version, perform the following steps.
On the navigation pane, click Application Update > Patch.Â
The Patch page displays the details of the current Kyvos version.
Select the required patch version from the Select Patch list that you want to deploy.Â
To configure the Patch Options, do the following:Â
Parameter/Field | Description |
---|---|
Create backup | Select this option to create a backup of the existing Kyvos environment before deploying the patch. Selecting this option will speed up patch deployment as no data backup will be performed. However, the currently deployed version can not be |
Create Semantic Model data backup | Select this option to create a backup of the existing cube data in your Kyvos environment. This may slow down the deployment for taking the backup of cube data. |
Create logs backup | Select this option to create a backup of the existing logs of your Kyvos environment |
Backup Path | Shows the backup path. The backup path should be consistent across all the available systems. To edit the path, use the Modify Backup Path option from the use three-dots menu. |
Click the Deploy Now button on the top-right of the page.
On the displayed confirmation message box, enter your Kyvos Manager Password to confirm upgrade deployment.
Â
Deleting Kyvos upgrade and patch bundlesÂ
From Kyvos 2023.3 onwards, during Kyvos upgrade and patch processes, the oldest backup bundle will be deleted automatically to retain the newest bundles within the specified limit. Suppose you choose to preserve 6 bundles out of 10 available. In this case, only the 6 most recent bundles will be saved, and the remaining 4 bundles will be deleted. The oldest of these 4 bundles, based on the date they were created, will be deleted first.
To delete a previous state of rollback, use the Manage Backup Bundles option from the three-dots menu.
In the Preserve Backup Bundles list, set the count to retain the bundles.Â
Points to know
If the number of bundles present exceeds the preserved count, the remaining bundle will be automatically selected, indicating that it will be deleted.
If the number of bundles equals the retention count, no bundles will be deleted.
Bundles can only be deleted by changing the preserve count. Selecting them for deletion is disabled and unsupported.Â
If the latest backup bundle is a Patch, then the most recent Kyvos bundle will also be preserved.
The backup bundles which are created for failed Kyvos upgrade or failed Patch operations will also be there in the list to delete.
Copyright Kyvos, Inc. All rights reserved.